THE PROJECT
Christchurch Stadium was a large project that we worked on for two years. The stadium's construction was pivotal for Christchurch, helping support the city’s rebuild and cultural life. The stadium has a capacity of 30,000 spectators and opened in March 2026 with Super Rugby Weekend.



Location
Sector
Division
Christchurch
Public & Civic
Passive Fire
The stadium's design was innovative and put people at its heart. The ground floor and Level 1 are reinforced with concrete columns and shear walls, with steel beams supporting the higher floors. The design also needed flexibility to accommodate overlay services such as communication, power, water and drainage. These services needed to adapt to the requirements of different events. This created many moving parts for our team to consider. We needed tailored passive fire solutions to maintain fire separation where these services passed through fire-rated elements.
Our team installed fire stopping around service penetrations in challenging spaces, working to tight timelines that required clear communication. The stadium was a huge team effort involving thousands of workers and multiple contractors working in the same locations. For our team, careful coordination and safety were essential.
Access restrictions were one of our biggest challenges. Most of the work was done at height and above other trades. Timing was very important not only for compliance but also to maintain a consistent workflow for us and others. Health and Safety had to be at the forefront for our team, to protect both our workers and those around them. Our team completed the two years of work without any injuries.
Communication is always a key factor in delivering compliant passive fire solutions. The stadium was no different, with our team working closely with fire engineers and designers. Our technical team is based in Christchurch. Having our team based locally helped us communicate effectively. We communicated through conversations, written correspondence and site visits. These connections helped us complete our work and coordinate passive fire requirements across the project.
This project was one of the most rewarding for us. We were recognised for the quality of our work and engaged with many contractors. We also learned more about other trades and how to coordinate our work with their timelines. Completing such a large project gave the team a real sense of accomplishment.
PRODUCTS USED
THE OUTCOME
It was an honour to be a part of such an iconic build in the heart of Christchurch. Seeing the stadium open and host sold-out events is a great reminder of why these builds happen. Our work may not be seen by everyone who walks through, but it is an important part of everything you do see. It has been rewarding to see how the stadium has brought new life to Christchurch.
.png)